Sun Mesa- Cholla Giga Site
-
1,500 MW Solar + 1,500 MW BESS | Arizona
The Sun Mesa – Cholla Giga Site is a large-scale renewable energy project designed to provide up to 1,500 MW of solar generation paired with 1,500 MW of battery storage (12+ hour duration). Strategically located in northern Arizona at an elevation above 5,600 feet, the site spans 11,000+ acres, with 200–500 acres available for data center or BTC operators seeking direct access to onsite power and fiber connectivity.
Key Highlights
-
Market: APS / Behind-the-meter (BTM) supply with co-location potential.
-
Capacity: 1,500 MW PV + 1,500 MW BESS (onsite, 2025–26 start).
-
Annual Output: ~13,000,000 MWh (solar + BESS combined).
-
Infrastructure:
-
Dual 345 kV double-circuit APS transmission lines onsite.
-
Planned 345 kV switchyard and substations for interconnection.
-
Access to 34.5 kV and 69 kV for microgrid connectivity.
-
-
Fiber Connectivity: Adjacent to CenturyLink backbone linking Dallas–Las Vegas.
-
Land Control: 11,000+ acres under site control; QOZ designation through 2026.
-
Timeline: Targeting Q4 2025 BTM operations, with grid COD expected Q4 2028.
-
Term: 15 years.
Strategic Advantages
-
Scalable Development: Ample acreage available for hyperscale data center co-location.
-
Prime Transmission Location: Direct tie-in to APS grid via 345 kV double-circuit lines crossing the property.
-
Future-Ready Infrastructure: Supports additional BTM power supply and microgrid solutions.
-
Incentives: Located in a Qualified Opportunity Zone, USDA-eligible, and in an energy community zone.
-