Sun Mesa- Cholla Giga Site

  • 1,500 MW Solar + 1,500 MW BESS | Arizona

    The Sun Mesa – Cholla Giga Site is a large-scale renewable energy project designed to provide up to 1,500 MW of solar generation paired with 1,500 MW of battery storage (12+ hour duration). Strategically located in northern Arizona at an elevation above 5,600 feet, the site spans 11,000+ acres, with 200–500 acres available for data center or BTC operators seeking direct access to onsite power and fiber connectivity.

    Key Highlights

    • Market: APS / Behind-the-meter (BTM) supply with co-location potential.

    • Capacity: 1,500 MW PV + 1,500 MW BESS (onsite, 2025–26 start).

    • Annual Output: ~13,000,000 MWh (solar + BESS combined).

    • Infrastructure:

      • Dual 345 kV double-circuit APS transmission lines onsite.

      • Planned 345 kV switchyard and substations for interconnection.

      • Access to 34.5 kV and 69 kV for microgrid connectivity.

    • Fiber Connectivity: Adjacent to CenturyLink backbone linking Dallas–Las Vegas.

    • Land Control: 11,000+ acres under site control; QOZ designation through 2026.

    • Timeline: Targeting Q4 2025 BTM operations, with grid COD expected Q4 2028.

    • Term: 15 years.

    Strategic Advantages

    • Scalable Development: Ample acreage available for hyperscale data center co-location.

    • Prime Transmission Location: Direct tie-in to APS grid via 345 kV double-circuit lines crossing the property.

    • Future-Ready Infrastructure: Supports additional BTM power supply and microgrid solutions.

    • Incentives: Located in a Qualified Opportunity Zone, USDA-eligible, and in an energy community zone.

Property Details

City : Holbrook Municipal Airport, Holbrook, AZ 86025
Property ID : 5359

Contacts

Company : GoSolar
Name : GoSolar
Phone : NA
Email : hello@gosolar.us
Website : https://gosolar.us/

Find on Map

realaz
I consent to have this site collect my Name, Email, and Phone.

Compare Listings

Title Price Status Type Area Purpose Bedrooms Bathrooms